Up goes the mast at Frémont Point

0

Building the transmitter

As Channel Television’s home was under construction so building at Fremont Point for the transmitting station proceeded. The new control room was installed along with programme input equipment and two parallel operated transmitters. All this equipment was installed, naturally, after the building of the station and mast.

 

The Channel Archive

Leave a Reply

Your email address will not be published. Required fields are marked *